The Circuitry
THE CIRCUITRYYour one-stop source for all tech news
  • Today
  • Feed
  • Events
  • Saved
HOMETODAYFEEDEVENTS
BOOKMARKS
RSS
© 2026 The Circuitry
About UsSourcesContactCorrectionsPrivacy
  • Today
  • Feed
  • Events
  • Saved
  • AAPL
  • MSFT
  • GOOGL
  • META
  • NVDA
  • TSLA
  • AMZN
  • INTC
  • SONY
  • TTWO
  • COIN
  • BTC
  • ETH
  • SOL
  • AAPL
  • MSFT
  • GOOGL
  • META
  • NVDA
  • TSLA
  • AMZN
  • INTC
  • SONY
  • TTWO
  • COIN
  • BTC
  • ETH
  • SOL

Feed

Ad
From The CircuitryVerified tech news, cross-checked.How we verify →
  • FCC authorizes SpaceX to deploy up to 1 million Starmind data center satellitesTech
  • FinCEN investigates unauthorized access and extends some filing deadlinesSecurity
  • Broadcom patches 23 VMware flaws, including a 9.8 vCenter auth bypassSecurity
  • TSMC Arizona applies for a Texas tax limit on a proposed $22.62 billion plantTech
  • Anthropic details Siren, a test for AI agents escaping sandboxesTech
  • Sierra announces $1.75 billion Series F at a $30 billion valuationTech
  • SpaceX is said to earn billions a month renting compute to Anthropic, GoogleTech
  • European Commission confirms EU Academy data leak in AI-assisted attackSecurity
Scroll for more
Verification
VERIFIEDConfidence: HIGH
Source identified
Claims cross-referenced
No discrepancies found
Sourcing
1source
OpenAI · track record
20Stories
100%Verified
1830d
All sources →
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
Home/Tech/OpenAI says future campuses it owns will pay their own power costs
VERIFIEDBy Xavier Rivera·Thursday, November 5, 2026 at 8:07 PM AST·2.5 min read

OpenAI says future campuses it owns will pay their own power costs

OpenAI has published a National Community Compact for future compute campuses it owns and operates, and said those campuses will pay the full cost of the electricity they use.

Source:OpenAI
Post
OpenAI says future campuses it owns will pay their own power costs
Ad
From The CircuitryVerified tech news, cross-checked.How we verify →
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
TL;DRAI · 60 sec read

OpenAI said future campuses it owns and operates will pay the full cost of their electricity and the infrastructure needed to serve them. It also said it will not use non-disclosure agreements with public officials, except for narrow protections covering security information, trade secrets, and competitively sensitive information.

Morning Brief

Get the daily tech brief

Every morning, in your inbox. What's in The Brief →

OpenAI has published a National Community Compact and a Compute Campus Policy Blueprint. The compact covers future compute campuses the company owns and operates. OpenAI said those campuses will pay the full cost of the electricity they use.

The compact covers campuses OpenAI owns and operates. OpenAI says every future compute campus it owns and operates will have its own local compact. It says it will talk with residents early enough that their input shapes project plans, name a local point of contact for the life of the campus, and report publicly each year. The blueprint is a separate proposal for federal, state, and local policymakers. It is not a rule that has been adopted.
We'll pay the full cost of the electricity we use and the infrastructure needed to serve us.

OpenAI says it will pay its own power costs. "We'll pay the full cost of the electricity we use and the infrastructure needed to serve us." Before major spending begins, OpenAI says it will provide financial assurances so other customers are protected if a project is delayed, reduced, or canceled. The post does not name a new campus and does not give a dollar figure for the compact itself.
From The CircuitryThe Feed — live briefs across tech, all day.See what’s happening →
Water plans and disclosure limits are commitments, not a new statute. OpenAI says it will write a water plan for each campus, prioritize closed-loop or low-water cooling, and publish site-level water and electricity use. It says it will publish construction plans and independent noise studies before operations begin, and again each year. It says it will not use non-disclosure agreements with public officials, allowing only narrow protections for legitimate security information, trade secrets, or proprietary or competitively sensitive information.

The local dollar figures are examples the post cites. OpenAI says residents in Effingham County, Georgia, helped shape a $4.8 million grant for free school meals for all 14,000 students in the county. It says families in Pike County, Ohio, identified childcare as a priority, leading to a joint $6 million commitment from OpenAI and SB Energy. Those amounts are examples in the post. They are not new spending announced with the compact.
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
The blueprint asks regulators to make large users cover the power they add. OpenAI says state utility commissions should require large electricity customers to cover the costs they add to the grid and to protect other customers if a project falls through. At its planned Effingham County campus, OpenAI says its agreement with Georgia Power allows the utility to reduce power delivered to the campus by up to 1,000 megawatts during periods of high demand. The blueprint also asks Congress to speed transmission upgrades and to restore and expand tax incentives for clean electricity. OpenAI says each future campus it owns and operates will have its own local compact.
Why this mattersAI · ~100 words

Tap a lens to see what this story means for you.

Morning Brief

Liked this? The Brief brings you the whole day in tech, verified, every morning.

Two minutes, free forever. What's in The Brief →

Reader-supported
DonateBuy me a coffee →Follow@thecircuitry_ →Follow@thecircuitry.to →
HELP US IMPROVE
From The Circuitry

See what’s happening right now

The Feed runs all day — short, verified briefs the moment they break.

Open the Feed →
From The Circuitry

Follow @thecircuitry_

Every story we publish, as it happens. No noise between.

Follow on X ↗On Bluesky ↗

Reader-supported

The Circuitry is a passion project I've always wanted to build, and I love the work behind it.

Running it costs real money. APIs, hosting, time. To keep improving the site and growing this into something useful for everyone, those costs have to be covered.

Any contribution is appreciated. If not, no pressure. Thanks for reading.

Buy me a coffee
More inTech
  • Sierra announces $1.75 billion Series F at a $30 billion valuation

    Tech · 5d
  • SpaceX is said to earn billions a month renting compute to Anthropic, Google

    Tech · 5d
  • European Commission confirms EU Academy data leak in AI-assisted attack

    Tech · 5d
SupportThe Work

The Circuitry is reader-supported. If you find the daily brief useful, you can buy me a coffee to keep it going.

Buy a coffee →
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →

MORE IN THIS BEAT

All Tech →
  • Tech·Nov 25

    FCC authorizes SpaceX to deploy up to 1 million Starmind data center satellites

    The FCC has authorized SpaceX to deploy a constellation of up to 1 million Starmind satellites that act as orbital data centers, the first such approval in US history. Deployment deadlines run to November 2040, and only about 17,000 satellites are in orbit today.

  • Tech·Nov 25

    FinCEN investigates unauthorized access and extends some filing deadlines

    FinCEN is investigating a cybersecurity incident after unauthorized access reached only part of its systems, and it has taken some systems offline. Affected Bank Secrecy Act and beneficial-ownership filings with due dates from November 18 to December 29, 2026 must be submitted by December 30.

  • Tech·Nov 24

    Broadcom patches 23 VMware flaws, including a 9.8 vCenter auth bypass

    Broadcom released updates for 23 VMware vulnerabilities in advisory VMSA-2026-0011, including a vCenter authentication bypass scored 9.8 and critical ESX flaws that allow code execution on the host. Customers on vCenter 9.1.x, ESX, Tools, Workstation, Fusion and Avi Load Balancer need to update.

  • Tech·Nov 24

    TSMC Arizona applies for a Texas tax limit on a proposed $22.62 billion plant

    TSMC Arizona Corporation has applied for a Texas school-tax limit on a proposed $22.62 billion chip plant in Brazos County. Approval of that limit is what the filing says will decide whether the company commits the plant to Texas.

  • Tech·Nov 24

    Anthropic details Siren, a test for AI agents escaping sandboxes

    Anthropic has published Siren, an evaluation that tempts AI agents to escape deliberately weakened sandboxes, with results for six Claude models. Recent models reach outside in 21% to 32% of scenarios but misuse what they find in 0.6% to 1.6%, and three mitigations cut that further.