The Circuitry
THE CIRCUITRYYour one-stop source for all tech news
  • Today
  • Feed
  • Events
  • Saved
HOMETODAYFEEDEVENTS
BOOKMARKS
RSS
© 2026 The Circuitry
About UsSourcesContactCorrectionsPrivacy
  • Today
  • Feed
  • Events
  • Saved
  • AAPL
  • MSFT
  • GOOGL
  • META
  • NVDA
  • TSLA
  • AMZN
  • INTC
  • SONY
  • TTWO
  • COIN
  • BTC
  • ETH
  • SOL
  • AAPL
  • MSFT
  • GOOGL
  • META
  • NVDA
  • TSLA
  • AMZN
  • INTC
  • SONY
  • TTWO
  • COIN
  • BTC
  • ETH
  • SOL

Feed

Ad
From The CircuitryVerified tech news, cross-checked.How we verify →
  • Boom fires its Superpower engine core for the first timeEnergy
  • Meta is re-evaluating its 2030 net-zero emissions goalEnergy
  • U.S. energy storage capacity has passed 200 GWhEnergy
  • PJM is filing a plan to cut interconnection studies from two years to oneEnergy
  • IEA says the oil market returns to a surplus this quarterEnergy
  • Eldridge-led group agrees to buy Lukoil's overseas energy assetsEnergy
  • ConocoPhillips agrees to sell its Norway business for $4.425 billionEnergy
Scroll for more
Verification
VERIFIEDConfidence: HIGH
Source identified
Claims cross-referenced
No discrepancies found
Sourcing
1source
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
Home/Energy/SBM Offshore will build the Longtail FPSO for ExxonMobil Guyana
VERIFIEDBy Xavier Rivera·Tuesday, November 17, 2026 at 8:14 PM AST·1.5 min read

SBM Offshore will build the Longtail FPSO for ExxonMobil Guyana

SBM Offshore has been awarded contracts to construct and install the Longtail FPSO for ExxonMobil Guyana. The vessel is designed for 250,000 barrels of condensate a day, with gas processing of 1.2 billion standard cubic feet each day.

Source:SBM Offshore
Post
SBM Offshore will build the Longtail FPSO for ExxonMobil Guyana
Ad
From The CircuitryVerified tech news, cross-checked.How we verify →
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
TL;DRAI · 60 sec read

SBM Offshore has been awarded contracts to construct and install the Longtail FPSO for ExxonMobil Guyana in the Stabroek Block. Daily design rates are 250,000 barrels of condensate and 1.2 billion standard cubic feet of gas. SBM expects to operate the vessel for an initial 10 years. The award follows a final investment decision on the eighth development in the block.

Morning Brief

Get the daily Energy brief

Every morning, in your inbox. What's in The Brief →

SBM Offshore has been awarded contracts to construct and install an FPSO for the Longtail project that ExxonMobil Guyana is developing in the Stabroek Block.

The award covers construction and installation. ExxonMobil Guyana Limited, an affiliate of ExxonMobil Holdings Corporation, is the client on the contracts and operates the block. SBM Offshore expects to run the vessel for an initial 10 years once it is on station. The operating plan draws on FPSOs already working in that block.
ExxonMobil Guyana and its co-venturers have taken a final investment decision, and the contract award follows that decision.

Design rates cover gas and condensate. Daily throughput is set at 1.2 billion standard cubic feet, measured as gas, and 250,000 barrels of condensate. The FPSO will sit on a spread mooring in water about 1,750 meters deep, with room for about 2 million barrels of condensate. The design uses a new-build multi-purpose floater hull, the tenth of that type.
From The CircuitryThe Feed — live briefs across tech, all day.See what’s happening →
Longtail is the eighth development in the block. The project lies about 200 kilometers offshore Guyana. Front-end engineering and design studies are complete. ExxonMobil Guyana and its co-venturers have taken a final investment decision, and the contract award follows that decision.

Fast4Ward supplies the hull design. Chief executive Øivind Tangen calls this the sixth FPSO award from ExxonMobil Guyana. He says the project "will require the highest gas-handling capacity ever deployed on an FPSO."
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
Guyanese companies and engineers are in the plan. Plans call for wider collaboration with firms in Guyana, local fabrication, and Guyanese engineers on the execution team and the operating crew. The release points to Liza Destiny and Liza Unity, then Prosperity, plus ONE GUYANA and Jaguar.
Why this mattersAI · ~100 words

Tap a lens to see what this story means for you.

Morning Brief

Liked this? The Brief brings you the whole day in tech, verified, every morning.

Two minutes, free forever. What's in The Brief →

Reader-supported
DonateBuy me a coffee →Follow@thecircuitry_ →Follow@thecircuitry.to →
HELP US IMPROVE
From The Circuitry

See what’s happening right now

The Feed runs all day — short, verified briefs the moment they break.

Open the Feed →
From The Circuitry

Follow @thecircuitry_

Every story we publish, as it happens. No noise between.

Follow on X ↗On Bluesky ↗

Reader-supported

The Circuitry is a passion project I've always wanted to build, and I love the work behind it.

Running it costs real money. APIs, hosting, time. To keep improving the site and growing this into something useful for everyone, those costs have to be covered.

Any contribution is appreciated. If not, no pressure. Thanks for reading.

Buy me a coffee
energyfpsoguyana
More inEnergy
  • Eldridge-led group agrees to buy Lukoil's overseas energy assets

    Energy · 2d
  • ConocoPhillips agrees to sell its Norway business for $4.425 billion

    Energy · 5d
SupportThe Work

The Circuitry is reader-supported. If you find the daily brief useful, you can buy me a coffee to keep it going.

Buy a coffee →
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →

MORE IN THIS BEAT

All Energy →
  • Energy·Nov 22

    Boom fires its Superpower engine core for the first time

    Boom has fired the prototype core of its Superpower engine for the first time, in a Nov. 21 test east of Denver. The core is meant for a 42-megawatt gas turbine for data centers, with a fully integrated engine test aimed at the middle of next year.

  • Energy·Nov 20

    Meta is re-evaluating its 2030 net-zero emissions goal

    Meta is re-evaluating the 2030 timeframe for its net-zero emissions goal and its near-term intensity targets. Long-term ambitions are unchanged, and the company has contracts for more than 30 GW of clean and renewable power.

  • Energy·Nov 17

    U.S. energy storage capacity has passed 200 GWh

    U.S. energy storage capacity has passed 200 GWh after 48.3 GWh of installations in the first nine months of 2026. Those additions are up 20% from a year earlier, and the industry outlook now expects 708 GWh online by 2030.

  • Energy·Nov 16

    PJM is filing a plan to cut interconnection studies from two years to one

    PJM has developed a plan to cut the study time for new generation and large-load transmission service from two years to one. The operator is filing it with federal regulators at the end of the day on November 16.

  • Energy·Nov 13

    IEA says the oil market returns to a surplus this quarter

    The IEA's November report says global oil supply has moved above demand for the first time since the war in Iran began. It expects a surplus in the fourth quarter of 2026 and a larger build in 2027.