The Circuitry
THE CIRCUITRYYour one-stop source for all tech news
HOMETODAYNEWSFEEDEVENTS
BOOKMARKS
RSS
© 2026 The Circuitry
About UsSourcesContactCorrectionsPrivacy
  • Today
  • Feed
  • Events
  • Saved
Scroll for more
Verification
VERIFIEDConfidence: HIGH
Source identified
Claims cross-referenced
No discrepancies found
Fact-check summary

Multiple outlets (Electrek, TechCrunch, InsideEVs) confirm Tesla's Sept 12 teaser post for an October 1 Roadster reveal with 'Go for launch' imagery hinting at SpaceX thrusters.

Sourcing
2independent sources

via TeslaNorth

TeslaNorth · track record
7Stories
100%Verified
130d
All sources →
Markets
TSLA···

Live quote · not investment advice

From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
Home/Tech/Tesla moves next-gen Roadster reveal to October 15
VERIFIEDBy Xavier Rivera· ·1.5 min read

Tesla moves next-gen Roadster reveal to October 15

Tesla postponed its next-gen Roadster reveal from October 1 to October 15, citing severe weather for an outdoor-only event. The company said additional details will follow and did not announce a new start time.

Source:TeslaNorth
Post
Tesla moves next-gen Roadster reveal to October 15
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
TL;DRAI · 60 sec read

Tesla postponed the next-gen Roadster reveal from October 1 to October 15, citing severe weather for an outdoor-only event. Additional details will follow. The car was announced in 2017 and has been delayed multiple times.

⚐ CORRECTED 

Updated September 29: Tesla moved the next-gen Roadster reveal from October 1 to October 15, citing severe weather for an outdoor-only event. No new start time was announced.

→ All corrections
Update, September 29, 2026: Tesla postponed the reveal. In an X post on September 28, the company said it was rescheduling because of severe weather and because the event can only be held outdoors. Tesla said the new date is October 15 and that additional details will follow. It did not announce a new start time. Source: https://x.com/Tesla/status/2104647484169728442

Tesla has scheduled the unveiling of its second-generation Roadster for October 1.
The Information recently reported that the 2017 version of the car had been completely abandoned for a new, yet-to-be-revealed design.
Tesla posted a cryptic teaser on X. On Saturday the automaker shared an image showing the sleek rear profile of a dark sports car under intense vertical light beams. The post carried the caption “Go for launch” and included a graphic displaying the date “10.01.”

The graphic also appears to hint at the promised cold gas thrusters developed by SpaceX.
From The CircuitryThe Feed — live briefs across tech, all day.See what’s happening →
The second-generation Roadster was first announced in 2017. Tesla revealed the vehicle in November 2017. It has been pushed back multiple times since then.
The long-awaited sports car continues to draw attention as one of Tesla’s most delayed projects.
The Information recently reported that the 2017 version of the car had been completely abandoned for a new, yet-to-be-revealed design.

Production remains at least a year away. Tesla CEO Elon Musk has previously acknowledged that even after the reveal the Roadster will not enter production for another 12 or 18 months. The long-awaited sports car continues to draw attention as one of Tesla’s most delayed projects.
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
The October 15 event is now the planned first public look at the updated design. No further specifications were disclosed in the teaser. The company has not commented on whether additional details will be shared at the reveal.
Why this mattersAI · ~100 words

Tap a lens to see what this story means for you.

Morning Brief

Liked this? The Brief brings you the whole day in tech, verified, every morning.

Two minutes, free forever. What's in The Brief →

Reader-supported
DonateBuy me a coffee →Follow@thecircuitry_ →Follow@thecircuitry.to →
HELP US IMPROVE
From The Circuitry

See what’s happening right now

The Feed runs all day — short, verified briefs the moment they break.

Open the Feed →
From The Circuitry

Follow @thecircuitry_

Every story we publish, as it happens. No noise between.

Follow on X ↗On Bluesky ↗

Reader-supported

The Circuitry is a passion project I've always wanted to build, and I love the work behind it.

Running it costs real money. APIs, hosting, time. To keep improving the site and growing this into something useful for everyone, those costs have to be covered.

Any contribution is appreciated. If not, no pressure. Thanks for reading.

Buy me a coffee
TeslaRoadsterEV
More fromTeslaNorth
  • SpaceX Targets Tower Catch for Starship on Next Flight

    Tech · 2mo
  • Dutch RDW Grants Provisional Approval for Tesla FSD

    Tech · 3mo
  • SpaceX Closes Record $85.7B IPO, Shares Jump 19%

    Tech · 3mo
More inTech
  • GlobalFoundries signs $2B TSMC deal for US silicon interposers

    Tech · 7h
  • SpaceX agrees to buy 800 MHz spectrum for Starlink Mobile

    Tech · 10h
  • Microsoft discloses CVE-2026-83947 in Azure Event Grid

    Tech · 10h
SupportThe Work

The Circuitry is reader-supported. If you find the daily brief useful, you can buy me a coffee to keep it going.

Buy a coffee →
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →

MORE IN THIS BEAT

All Tech →
  • Tech· 

    Tesla Opened 1.8M-Sq-Ft Semi Plant for High-Volume Production

    Tesla marked the start of high-volume Semi production at its new Sparks, Nevada factory on September 24. The plant, which Tesla says covers 1.8 million square feet, is built to scale to 50,000 trucks annually.

  • Tech· 

    Tesla Audits China Suppliers Ahead of Optimus Production Prep

    Tesla reportedly conducted intensive supplier audits across China's Yangtze River Delta last week as it prepares Optimus production. The visits to potential suppliers Tuopu Group, Sanhua Holding Group, and Joyson Electronics in Ningbo, Hangzhou, and Shanghai leverage existing automotive partners rather than confirming a mass-production acceleration.

  • Tech· 

    Tesla Sends Invites for Semi Rollout Event on September 24

    Tesla has started sending invitations for its Semi Rollout event on September 24 at the new factory in Sparks, Nevada. The gathering will showcase the facility, which Tesla says covers 1.8 million square feet, built to produce up to 50,000 trucks per year along with refreshed vehicle features and fleet economics.

  • Tech· 

    Electric Mobility Shakeups: Bike Maker Bankruptcy, Tesla FSD Reversal

    A roundup of electric mobility news on September 5, 2026 highlights the August 11 bankruptcy at Accell Group and July 29 judicial recovery for CactUs Lock, a prominent charging myth on French radio, solar battery test results, and a policy reversal on Tesla FSD following July resistance. These stories illustrate ongoing financial fragility, public misunderstanding of EV best practices, and evolving regulatory attitudes across Europe.

  • Tech· 

    Tesla Unveils Production Cybercab With Unboxed Manufacturing

    Tesla revealed the production Cybercab at an Austin event on September 4, 2026, showcasing its unboxed manufacturing process and new hardware components. The two-seater autonomous vehicle uses a pure-vision system with a drag coefficient under 0.20 and omits any immediate plans for individual customer sales.