The Circuitry
THE CIRCUITRYYour one-stop source for all tech news
  • Today
  • Feed
  • Events
  • Saved
HOMETODAYFEEDEVENTS
BOOKMARKS
RSS
© 2026 The Circuitry
About UsSourcesContactCorrectionsPrivacy
  • Today
  • Feed
  • Events
  • Saved
  • AAPL
  • MSFT
  • GOOGL
  • META
  • NVDA
  • TSLA
  • AMZN
  • INTC
  • SONY
  • TTWO
  • COIN
  • BTC
  • ETH
  • SOL
  • AAPL
  • MSFT
  • GOOGL
  • META
  • NVDA
  • TSLA
  • AMZN
  • INTC
  • SONY
  • TTWO
  • COIN
  • BTC
  • ETH
  • SOL

Feed

Ad
From The CircuitryVerified tech news, cross-checked.How we verify →
  • Eldridge-led group agrees to buy Lukoil's overseas energy assetsEnergy
  • ConocoPhillips agrees to sell its Norway business for $4.425 billionEnergy
  • Boom fires its Superpower engine core for the first timeEnergy
  • Meta is re-evaluating its 2030 net-zero emissions goalEnergy
  • SBM Offshore will build the Longtail FPSO for ExxonMobil GuyanaEnergy
  • U.S. energy storage capacity has passed 200 GWhEnergy
  • PJM is filing a plan to cut interconnection studies from two years to oneEnergy
  • IEA says the oil market returns to a surplus this quarterEnergy
Scroll for more
Verification
VERIFIEDConfidence: HIGH
Source identified
Claims cross-referenced
No discrepancies found
Sourcing
1source
Markets
F···

Live quote · not investment advice

Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
Home/Energy/Ford Energy reportedly will deploy batteries with DESRI
VERIFIEDBy Xavier Rivera·Thursday, November 5, 2026 at 1:32 PM AST·1.5 min read

Ford Energy reportedly will deploy batteries with DESRI

Ford Energy has reportedly agreed to work with DESRI to deploy battery storage across the U.S. DESRI plans to buy Ford Energy units for its own solar and storage projects. No start date is stated cleanly.

Source:Ford Authority
Post
Ford Energy reportedly will deploy batteries with DESRI
Ad
From The CircuitryVerified tech news, cross-checked.How we verify →
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
TL;DRAI · 60 sec read

Ford Energy has reportedly teamed with DESRI to deploy battery storage in the U.S. DESRI plans to buy Ford Energy units for utility solar and storage projects. The report also says the Glendale, Kentucky plant is being converted, with at least 20 GWh a year once it is running.

Ford Energy has reportedly agreed to work with DESRI to deploy battery storage across the United States. The November 5 report does not name a first project site, a purchase volume, or a price.
DESRI plans to purchase and integrate BESS from Ford Energy to support its own large-scale utility solar and storage projects.
DESRI plans to purchase and integrate BESS from Ford Energy to support its own large-scale utility solar and storage projects. The report describes DESRI as a company that develops, owns, and operates renewable and battery assets in the U.S. It says the two will deploy storage units around the country and add dispatchable capacity to the grid. It does not say how many units DESRI has ordered.
From The CircuitryThe Feed — live briefs across tech, all day.See what’s happening →
The plant context is separate from the order size. The report says Ford Energy has taken over the former BlueOval SK joint-venture plant in Glendale, Kentucky, and is converting it to build units for utilities, data centers, and large industrial and commercial customers in the U.S. It says Ford Energy expects at least 20 GWh a year once that facility is running. It also says the company is exploring products beyond the FE-250 and FE-450 DC blocks. It does not give those blocks' capacity or price.

A start date is not clean in this report. One line says production is expected in late 2027. A linked headline on the same page says production by 2028. Those do not match, so this piece does not treat either date as confirmed. The report also points to a separate note that contracts and late-stage talks cover most 2028 capacity. That figure is not restated here.
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
The collaboration is a deployment plan, not a finished plant. The report does not say the Glendale line is producing, and it does not say DESRI has taken delivery. It says Ford Energy is seeing demand for U.S.-assembled grid-scale units, and that the DESRI work is meant to place those units on projects DESRI already develops.
Why this mattersAI · ~100 words

Tap a lens to see what this story means for you.

Morning Brief

Liked this? The Brief brings you the whole day in tech, verified, every morning.

Two minutes, free forever. What's in The Brief →

Reader-supported
DonateBuy me a coffee →Follow@thecircuitry_ →Follow@thecircuitry.to →
HELP US IMPROVE
From The Circuitry

See what’s happening right now

The Feed runs all day — short, verified briefs the moment they break.

Open the Feed →
From The Circuitry

Follow @thecircuitry_

Every story we publish, as it happens. No noise between.

Follow on X ↗On Bluesky ↗

Reader-supported

The Circuitry is a passion project I've always wanted to build, and I love the work behind it.

Running it costs real money. APIs, hosting, time. To keep improving the site and growing this into something useful for everyone, those costs have to be covered.

Any contribution is appreciated. If not, no pressure. Thanks for reading.

Buy me a coffee
More inEnergy
  • U.S. energy storage capacity has passed 200 GWh

    Energy · 11d
  • PJM is filing a plan to cut interconnection studies from two years to one

    Energy · 12d
  • IEA says the oil market returns to a surplus this quarter

    Energy · 14d
SupportThe Work

The Circuitry is reader-supported. If you find the daily brief useful, you can buy me a coffee to keep it going.

Buy a coffee →
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →

MORE IN THIS BEAT

All Energy →
  • Energy·Nov 26

    Eldridge-led group agrees to buy Lukoil's overseas energy assets

    A U.S.-led consortium including the Development Finance Corporation has agreed to acquire Lukoil's international energy assets through a share swap. The deal covers upstream output of about 350,000 barrels of oil equivalent per day, three refineries and more than 2,000 stations, and still needs conditional OFAC approval.

  • Energy·Nov 23

    ConocoPhillips agrees to sell its Norway business for $4.425 billion

    ConocoPhillips has agreed to sell its Norway business and its 40.25% Teesside terminal interest to Vår Energi for total consideration of $4.425 billion. After adjustments and a tax liability, total consideration is expected to be $3.9 billion, with about $2.5 billion in net cash proceeds.

  • Energy·Nov 22

    Boom fires its Superpower engine core for the first time

    Boom has fired the prototype core of its Superpower engine for the first time, in a Nov. 21 test east of Denver. The core is meant for a 42-megawatt gas turbine for data centers, with a fully integrated engine test aimed at the middle of next year.

  • Energy·Nov 20

    Meta is re-evaluating its 2030 net-zero emissions goal

    Meta is re-evaluating the 2030 timeframe for its net-zero emissions goal and its near-term intensity targets. Long-term ambitions are unchanged, and the company has contracts for more than 30 GW of clean and renewable power.

  • Energy·Nov 17

    SBM Offshore will build the Longtail FPSO for ExxonMobil Guyana

    SBM Offshore has been awarded contracts to construct and install the Longtail FPSO for ExxonMobil Guyana. The vessel is designed for 250,000 barrels of condensate a day, with gas processing of 1.2 billion standard cubic feet each day.