The Circuitry
THE CIRCUITRYYour one-stop source for all tech news
  • Today
  • Feed
  • Events
  • Saved
HOMETODAYFEEDEVENTS
BOOKMARKS
RSS
© 2026 The Circuitry
About UsSourcesContactCorrectionsPrivacy
  • Today
  • Feed
  • Events
  • Saved
  • AAPL
  • MSFT
  • GOOGL
  • META
  • NVDA
  • TSLA
  • AMZN
  • INTC
  • SONY
  • TTWO
  • COIN
  • BTC
  • ETH
  • SOL
  • AAPL
  • MSFT
  • GOOGL
  • META
  • NVDA
  • TSLA
  • AMZN
  • INTC
  • SONY
  • TTWO
  • COIN
  • BTC
  • ETH
  • SOL

Feed

Ad
From The CircuitryVerified tech news, cross-checked.How we verify →
  • Eldridge-led group agrees to buy Lukoil's overseas energy assetsEnergy
  • ConocoPhillips agrees to sell its Norway business for $4.425 billionEnergy
  • Boom fires its Superpower engine core for the first timeEnergy
  • Meta is re-evaluating its 2030 net-zero emissions goalEnergy
  • SBM Offshore will build the Longtail FPSO for ExxonMobil GuyanaEnergy
  • U.S. energy storage capacity has passed 200 GWhEnergy
  • PJM is filing a plan to cut interconnection studies from two years to oneEnergy
  • IEA says the oil market returns to a surplus this quarterEnergy
Scroll for more
Verification
VERIFIEDConfidence: HIGH
Source identified
Claims cross-referenced
No discrepancies found
Sourcing
1source
pv magazine · track record
3Stories
100%Verified
330d
All sources →
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
Home/Energy/Panamint says it closed the first phase of a $1.8 billion solar loan
VERIFIEDBy Xavier Rivera·Monday, November 9, 2026 at 8:04 AM AST·2 min read

Panamint says it closed the first phase of a $1.8 billion solar loan

Panamint Capital says it closed a $769 million first phase of a $1.8 billion loan for the Big Rooter solar project in Robertson County, Texas.

Source:pv magazine
Post
Panamint says it closed the first phase of a $1.8 billion solar loan
Ad
From The CircuitryVerified tech news, cross-checked.How we verify →
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
TL;DRAI · 60 sec read

Panamint Capital says it closed a $769 million first phase of a $1.8 billion green loan for Big Rooter West, a 491 megawatt-dc solar project on reclaimed mine land in Robertson County, Texas. A later phase of more than $1 billion would finance a 658 megawatt-dc second stage.

Morning Brief

Get the daily Energy brief

Every morning, in your inbox. What's in The Brief →

Panamint Capital says it has closed the first phase of a $1.8 billion green loan. The money is for the Big Rooter Power solar project at its Twin Oaks station in Robertson County, Texas. The company says the project is being built on reclaimed coal mine land.

The first phase is $769 million. Panamint says that amount will fund ongoing construction of Big Rooter West, a 491 megawatt-dc portion. Construction on the first phase got underway in July. The arrays sit on 4,458 acres of reclaimed mine land at the Twin Oaks complex, halfway between Dallas and Houston.
Financing on that phase is expected to close in the first quarter of 2027.

A second phase is still ahead. The company says a later phase of more than $1 billion will finance Big Rooter East, a 658 megawatt-dc stage. It says that stage is slated to begin construction in December 2026 and enter commercial operation in August 2029. Financing on that phase is expected to close in the first quarter of 2027.
From The CircuitryThe Feed — live briefs across tech, all day.See what’s happening →
The chief executive described the finished complex. Apolka Totth said, "When Big Rooter is complete, the Twin Oaks complex will have 1.5 GW of operating thermal and renewable power, in addition to over 20 miles of new 345 kV transmission, 1.6 GWh of battery energy storage and 790 MW of Batch Zero data center capacity under development across our 10,000-acre site."

A buyer is signed, and the name is not public. Bill Stanton, managing director of development, said the company signed a long-term power purchase agreement with one of the country's largest companies. He did not name the buyer. Panamint says the electricity is meant to serve that contract into the 2050s.
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
Contractors are named. Panamint says Solv Energy will handle engineering, procurement and construction, including the solar arrays, substation and transmission. It says First Solar will supply about 2 million panels made in Ohio, Louisiana and Alabama, and that Nextpower will supply its NX Horizon trackers. The projects reportedly will use over 34,000 tons of domestically manufactured steel. Panamint says construction of both phases is expected to create over 800 jobs.
Why this mattersAI · ~100 words

Tap a lens to see what this story means for you.

Morning Brief

Liked this? The Brief brings you the whole day in tech, verified, every morning.

Two minutes, free forever. What's in The Brief →

Reader-supported
DonateBuy me a coffee →Follow@thecircuitry_ →Follow@thecircuitry.to →
HELP US IMPROVE
From The Circuitry

See what’s happening right now

The Feed runs all day — short, verified briefs the moment they break.

Open the Feed →
From The Circuitry

Follow @thecircuitry_

Every story we publish, as it happens. No noise between.

Follow on X ↗On Bluesky ↗

Reader-supported

The Circuitry is a passion project I've always wanted to build, and I love the work behind it.

Running it costs real money. APIs, hosting, time. To keep improving the site and growing this into something useful for everyone, those costs have to be covered.

Any contribution is appreciated. If not, no pressure. Thanks for reading.

Buy me a coffee
More inEnergy
  • U.S. energy storage capacity has passed 200 GWh

    Energy · 11d
  • PJM is filing a plan to cut interconnection studies from two years to one

    Energy · 12d
  • IEA says the oil market returns to a surplus this quarter

    Energy · 15d
SupportThe Work

The Circuitry is reader-supported. If you find the daily brief useful, you can buy me a coffee to keep it going.

Buy a coffee →
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →

MORE IN THIS BEAT

All Energy →
  • Energy·Nov 26

    Eldridge-led group agrees to buy Lukoil's overseas energy assets

    A U.S.-led consortium including the Development Finance Corporation has agreed to acquire Lukoil's international energy assets through a share swap. The deal covers upstream output of about 350,000 barrels of oil equivalent per day, three refineries and more than 2,000 stations, and still needs conditional OFAC approval.

  • Energy·Nov 23

    ConocoPhillips agrees to sell its Norway business for $4.425 billion

    ConocoPhillips has agreed to sell its Norway business and its 40.25% Teesside terminal interest to Vår Energi for total consideration of $4.425 billion. After adjustments and a tax liability, total consideration is expected to be $3.9 billion, with about $2.5 billion in net cash proceeds.

  • Energy·Nov 22

    Boom fires its Superpower engine core for the first time

    Boom has fired the prototype core of its Superpower engine for the first time, in a Nov. 21 test east of Denver. The core is meant for a 42-megawatt gas turbine for data centers, with a fully integrated engine test aimed at the middle of next year.

  • Energy·Nov 20

    Meta is re-evaluating its 2030 net-zero emissions goal

    Meta is re-evaluating the 2030 timeframe for its net-zero emissions goal and its near-term intensity targets. Long-term ambitions are unchanged, and the company has contracts for more than 30 GW of clean and renewable power.

  • Energy·Nov 17

    SBM Offshore will build the Longtail FPSO for ExxonMobil Guyana

    SBM Offshore has been awarded contracts to construct and install the Longtail FPSO for ExxonMobil Guyana. The vessel is designed for 250,000 barrels of condensate a day, with gas processing of 1.2 billion standard cubic feet each day.